SNC-Lavalin's technologists design projects to make optimum use of material and personnel. Bio-safety precautions are integrated in the preliminary stages of a project, as are the decontamination of all air locks and equipment. Automation is used wherever possible to reduce the risk of cross contamination with support equipment.
 
Projects Contacts

Biotechnology Manufacturing Facility (BMF)

New biotechnology manufacturing facility.Facility, process, automation and cleaning validation. Client: Cangene Corporation

Country : Canada

Cell Banking Facility

Provided construction management for a Class 10,000 and Class 10,000 GMP space for Cell Banking and Cell Sorting. The facility also included a non-GMP research and development area. Separate air handling systems and separate PLC BAS control systems serve both the GMP and non-GMP spaces.SCADA alarm systems were incorporated into each BAS system to monitor the environment of all lab equipment. Utility systems included CO2, O2, N2, lab vacuum, and USP water systems. Client: Centocor

Country : United States

Pilot Plant

The SNC-Lavalin team has worked on multiple projects for Centocor, Inc. at their Malvern, PA facility. The projects included engineering, construction management, and commissioning assignments. The team provided design and construction services for a 3,000 sq.ft GMP pilot plant within an existing building.The project incorporated a Class 100,000 clean room environment (supported by a new, 8,000 SCFM roof top AHU system with room HEPA filters), USP, WFI, clean steam, oil free compressed air, portable CIP skid, double contained lab waste system, and process cooling/heating water system. Client: Centocor

Country : United States

General Renovation of Building 15

Complete renovation of existing vaccine production plant.  EPCMV services for the general renovation of the INRS Campus Building 15. Client: GlaxoSmithKline Biologicals

Country : Canada

Hemolink(TM) commercial production facility

Construction of HemolinkTM commercial production facility.Engineering, procurement and construction of commercial facility upgrade (Hemolink). Client: Hemosol Inc.

Country : Canada

Université de Montréal Faculty of Veterinary Medicine for the University Medical Centre and the Veterinary Biotech and Food Institute

Construction, expansion and retrofitting. Engineering services and site supervision during construction. Client: Université de Montréal

Country : Canada

Biotechnology Research Institute - New Research Centre

Construction of a new two-storey building and mechanical room.Design, plans and specifications, and partial supervision of mechanical, electrical, automation work as well as laboratory equipment. Client: Canadian National Research Council

Country : Canada

Laboratory and Office Renovation

This fast-tracked project started design April 11, 2005, and received occupancy on September 30, 2005. The project consisted of design/build services for the renovation of 18,000 sq.ft of existing mixed space.The renovated space included offices, cell culture and strain development areas, cryo labs, stability rooms, chemistry labs, a wash area and a pilot plant. The utility work included all equipment and distribution for OFPA, DI/RO Water, vacuum, natural gas, steam, O2, and nitrogen. Client: Phyton Biotech

Country : United States

Biotechnology Research, Development and Production Laboratory

New state-of-the-art biopharmaceutical contract manufacturing facility.Process, clean utility and facility design, full-time construction supervision, start-up and commissioning, and clean utility validation.ClientDSM Biologics Inc.

Country : Canada

Biotechnology Manufacturing Facility (BMF)

New biotechnology manufacturing facility.Facility, process, automation and cleaning validation. Client: Cangene Corporation

Cell Banking Facility

Provided construction management for a Class 10,000 and Class 10,000 GMP space for Cell Banking and Cell Sorting. The facility also included a non-GMP research and development area. Separate air handling systems and separate PLC BAS control systems serve both the GMP and non-GMP spaces.SCADA alarm systems were incorporated into each BAS system to monitor the environment of all lab equipment. Utility systems included CO2, O2, N2, lab vacuum, and USP water systems. Client: Centocor

Pilot Plant

The SNC-Lavalin team has worked on multiple projects for Centocor, Inc. at their Malvern, PA facility. The projects included engineering, construction management, and commissioning assignments. The team provided design and construction services for a 3,000 sq.ft GMP pilot plant within an existing building.The project incorporated a Class 100,000 clean room environment (supported by a new, 8,000 SCFM roof top AHU system with room HEPA filters), USP, WFI, clean steam, oil free compressed air, portable CIP skid, double contained lab waste system, and process cooling/heating water system. Client: Centocor

General Renovation of Building 15

Complete renovation of existing vaccine production plant.  EPCMV services for the general renovation of the INRS Campus Building 15. Client: GlaxoSmithKline Biologicals

Hemolink(TM) commercial production facility

Construction of HemolinkTM commercial production facility.Engineering, procurement and construction of commercial facility upgrade (Hemolink). Client: Hemosol Inc.

Université de Montréal Faculty of Veterinary Medicine for the University Medical Centre and the Veterinary Biotech and Food Institute

Construction, expansion and retrofitting. Engineering services and site supervision during construction. Client: Université de Montréal

Biotechnology Research Institute - New Research Centre

Construction of a new two-storey building and mechanical room.Design, plans and specifications, and partial supervision of mechanical, electrical, automation work as well as laboratory equipment. Client: Canadian National Research Council

Laboratory and Office Renovation

This fast-tracked project started design April 11, 2005, and received occupancy on September 30, 2005. The project consisted of design/build services for the renovation of 18,000 sq.ft of existing mixed space.The renovated space included offices, cell culture and strain development areas, cryo labs, stability rooms, chemistry labs, a wash area and a pilot plant. The utility work included all equipment and distribution for OFPA, DI/RO Water, vacuum, natural gas, steam, O2, and nitrogen. Client: Phyton Biotech

Biotechnology Research, Development and Production Laboratory

New state-of-the-art biopharmaceutical contract manufacturing facility.Process, clean utility and facility design, full-time construction supervision, start-up and commissioning, and clean utility validation.ClientDSM Biologics Inc.